One of Portrush Construction's major points of difference is that they use a system for installing panels that involves superslim soldier being set up with chain blocks (secured to the floors above).

The tower crane can then lifts the panels into position and we can transfer them onto our chain blocks – then the crane can be unhooked quickly and efficiently. Portrush Construction are then able to set and fix off the panels by making adjusts with the chain blocks - which ultimately frees up the crane up to carry on with the rest of the build.

This methodology reduces the tower crane time required for the panel installation dramatically compared to traditional methods where the crane is required to set and fix off the panels, saving you costs and time.

CALL US NOW

Voco-HIE Hotel - 13 Wyndham Street, Auckland

Sylvia Park Tower 3 - Sylvia Park, Auckland

Sylvia Park Build-To-Rent - Sylvia Park Auckland

Panel Lift

Our Services
Precast Install
Site Welding Services
Temporary Works
Steel Fabrication & Installation
  • Home
  • About
  • Services
  • Contact
website by designer websites